According to press reports, the drailment of the oil train in West Virginia was inspected 3 days before the accident.
For those of you who track the technology aspect of railroads, what exactly does such an "inspection" consist of? Is the track in such crummy shape
that it fails 3 days after passing inspection? It seems as if better inspections need to be made.
Sysop: | DaiTengu |
---|---|
Location: | Appleton, WI |
Users: | 1,064 |
Nodes: | 10 (0 / 10) |
Uptime: | 154:03:02 |
Calls: | 13,691 |
Calls today: | 1 |
Files: | 186,936 |
D/L today: |
2,790 files (808M bytes) |
Messages: | 2,411,068 |